Konton ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Company ASEA Engineering Category High Voltage Substations Start time 2025 Delivery 2026 Feedback Successfully Commissioned Project Description Turnkey modernization of 220KV GIS circuit breaker mechanisms including design, engineering, manufacturing, supply, installation, testing, and commissioning. The project includes replacement of 36 circuit breaker mechanisms across 12 circuit breakers in Bahteem, Basateen, and Sakr Koreish substations, along…
Company ASEA Engineering Category Suez 500KV AIS Substation Retrofit Start time 2023 Delivery 2023 Feedback Operational for 2+ Years Project Description Retrofit of 500KV AIS substation circuit breakers including design, engineering, manufacturing, supply, installation, testing, and commissioning. Scope includes replacement of 15 operating rods for 500KV circuit breakers to upgrade existing systems and enhance performance….
Company ASEA Engineering Category PV Power Plant Integration Start time 2022 Delivery 2024 Feedback Successfully Commissioned Project Description Modification of load dispatch center to integrate a 90/33KV substation and PV power plant. Scope includes supervision of SCADA system configuration, substation automation system commissioning, and installation of communication systems including SDH, MUX, teleprotection, weather stations, and…
Company ASEA Engineering Category PV Power Plant Integration Start time 2022 Delivery 2024 Feedback Operational Project Description Configuration, testing, and commissioning of SCADA system for PV power plant including integration of PV inverters, trackers, weather stations, and medium voltage switchgear. Includes modification of load dispatch center and reconfiguration of substation RTU. Following Process SCADA Configuration…
Company ASEA Engineering Category RTU & Smart Infrastructure Start time 2023 Delivery 2024 Feedback Delivered Successfully Project Description Design, engineering, manufacturing, supply, configuration, testing, and commissioning of 44 RTU panels for power distribution and transformer buildings. Includes full cabling works, termination, and installation of supporting infrastructure. Following Process Engineering Design 01 RTU system and panel…
Company ASEA Engineering Category Engineering Consultancy Start time 2019 Delivery 2019 Feedback Successfully Delivered Project Description Consultancy services for 220/22/22KV GIS substation including design review, supervision, and support until energization and commissioning. Includes coordination of main equipment such as GIS, transformers, AIS systems, and automation systems. Following Process Consultancy & Design Review 01 Technical evaluation…
Company Egyptian National Railways (ENR) Category Railway Communication Systems Start time 2025 Delivery Completed Feedback Satisfied Client Project Description ASEA successfully executed the 50LX Project for Egyptian National Railways (ENR), delivering advanced communication and voice integration systems for railway level crossings and signal blocks. The project included the design, engineering, manufacturing, and supply of 100…
Passionate people with the Best tools and approaches.