ASEA Engineering
High Voltage Substations
2025
2026
Successfully Commissioned
Project Description
Turnkey modernization of 220KV GIS circuit breaker mechanisms including design, engineering, manufacturing, supply, installation, testing, and commissioning.
The project includes replacement of 36 circuit breaker mechanisms across 12 circuit breakers in Bahteem, Basateen, and Sakr Koreish substations, along with modification of substation control circuits.
Following Process
Design & Engineering
01
Engineering and system design for new mechanisms
Manufacturing & Supply
02
Production and delivery of required components and mechanisms
Installation & Retrofit
01
On-site replacement, upgrades, and system integration
Testing & Commissioning
04
Full system validation and energization
Full system validation and energization
Successful delivery of substation modernization and retrofit projects with proven operation in high voltage environments, ensuring system reliability and compliance with international standards.